

| Length of pipeline (including 80 km ‘2nd Line‘ in Belgium) | 495 km |
| Turnover | € 35 m |
| Diametinch | 10 inch |
| Coating | Bitumen/polyethylene |
| Minimum/maximum temperatur | -40°C / +40°C |
| Maximum operating pressure | 100 bar |
| Transport capacity | approx. 2.5 million tons per year |
| Valve stations | approx. 50 in Germany / approx. 40 in the Netherlands/Belgium |